+7 953 733-48-24

Industrial transformer substation

2modular packaged transformer substation 4000 kVA / 10/0.4 kV

Project article: 2BKTP-4000-10-04

Two-transformer block substation with a total installed capacity of 4000 kVA: two dry transformers of 2000 kVA and two sections 0.4 kV switchgear.

Price on Request

Power is generated by two serial dry transformers of 2000 kVA. The sectional switch, automatic transfer switch and the admissibility of parallel operation are determined by the project. Price, climatic modification and EXW/FOB/DDP conditions are fixed after agreeing on a single-line diagram.

Call Us

Technical Data

Model Specifications

Design parameters. The final configuration is confirmed by a single-line diagram and a technical and commercial proposal.

Installed power
4000 kVA
Transformer circuit
2 × 2000 kVA
High/low voltage
10 / 0.4 kV, 50 Hz
Transformer
dry cast, connection diagram D/Yn-11 (Dyn11)
Execution
two-transformer 2modular packaged transformer substation in a modular building
Serial basis
Serial dry transformers Xinhuan 2000 kVA
10 kV switchgear
complete switchgear with protection
0.4 kV switchgear
two sections, a sectional apparatus and an automatic transfer switch - according to the project
Relay protection
microprocessor, operating range 45–55 Hz
Commercial accounting
accuracy class not lower than 1.0
Engineering systems
heating, ventilation, lighting, own needs
Safety
thermal protection, security and fire alarm, grounding
Integration
design and approval of connection diagram
Delivery terms
EXW / FOB / DDP Saransk - according to confirmed technical and commercial proposal

Model architecture

2 × 2000 kVA dual-transformer 2modular packaged transformer substation

Power is generated by two serial dry transformers of 2000 kVA. The sectional switch, automatic transfer switch and the admissibility of parallel operation are determined by the project.

Transformer part

2 × 2000 kVA

10 / 0.4 kV

Dry cast transformers with aluminum winding in the base; copper winding is a separate option.

Load distribution

Two sections 0.4 kV

about 2.89 kA per section 0.4 kV

Sectioning reduces the current of each section and allows load redundancy to be designed.

Production site

Assembly of cabinets and modules modular packaged transformer substation

Video provided by potential manufacturer during technical development. It shows the assembly of NKU, switching equipment and finished modules; the specific configuration of HELIKOR is confirmed by FAT.

Complete delivery

From 10 kV switchgear to distribution 0.4 kV

The substation is equipped as a factory module, and current-carrying parts are calculated based on actual power and short-circuit currents.

01

Reception 10 kV

KRU/KSO or compact switchgear with switching, protection, measurement and cable entries.

02

Conversion

2 × 2000 kVA in a safe modular design.

03

Distribution 0.4 kV

Busbars, incoming, sectional and outgoing devices are selected according to load, selectivity and short-circuit current.

04

Factory readiness

Heating, ventilation, auxiliary needs, thermal control and fire safety equipment are collected and checked before shipment.

Contents of the project supply

Equipment, module and engineering systems

The basic development includes 10 kV switchgear, dry transformer, 0.4 kV switchgear, microprocessor relay protection and automation, commercial accounting, auxiliary and thermal protection cabinets, ventilation, heating, lighting, grounding and fire alarm.

  1. 01Checking a single-line diagram and calculating currents
  2. 02Coordination of equipment, layout and climatic design
  3. 03FAT, supply, installation and input support

Engineering check

Devices 0.4 kV - only after calculation

Rated current: about 2.89 kA per section 0.4 kV. The rating of busbars, input and sectional devices is confirmed by the manufacturer based on transformers, permissible overload and short-circuit current.

Project equipment

Get the price, production time and delivery schedule

We will prepare an EXW/FOB or DDP offer to the site, disclosing the composition, logistics, duties, 22% VAT and unloading boundaries.

?HelpAll Products

HELIKOR

Request a quote

Leave your contacts and we will clarify the task, equipment and delivery time.