4×5.0 MWh
≈ 20 MWh nominal20ft liquid cooled plate containers. Compact delivery scheme; confirmation of ≥15 MWh useful AC energy per 6 kV is required.

Visualization of design execution. The number and arrangement of identical modules are determined by the working design.
The main project according to the original technical specifications
Project article: SNEE-5000-3H-LFP
Container LFP complex: approximately 20 MWh nominal capacity for guaranteed output of at least 15 MWh useful AC energy on side 6 kV.
There is a comparison of factory offers for architecture 5 MW / about 20 MWh nominal. The final price is fixed after guaranteeing ≥15 MWh useful AC energy for 6 kV, choice of cooling, logistics and Russian installation.
Technical data on the original technical specifications
Each line corresponds to a requirement of the original job. Design values are confirmed by the manufacturer as part of technical and commercial proposal.
Proposed factory architectures
Status: preliminary technical study. The exact model, number of containers and guaranteed energy are fixed in the technical and commercial proposal and the contract.
20ft liquid cooled plate containers. Compact delivery scheme; confirmation of ≥15 MWh useful AC energy per 6 kV is required.
20ft liquid cooled immersion containers. Provides greater energy reserves; the final choice is made after calculating losses, resource and cost.
Acceptance criterion
The usable energy includes the operating range of the SOC, battery, PCS and transformer losses, HVAC auxiliary needs, temperature reduction and the agreed degradation margin. The nominal capacity of containers in itself does not confirm the fulfillment of the technical specifications.
Compliance with the original technical specifications
The parameters below have been transferred from the main text and appendices of the technical specifications. The final values are confirmed by the manufacturer's design and proposal.
Bi-directional PCS, DC cabinets and battery strings with BMS coordination.
Full design power continuously, after an overnight charge of up to 8 hours.
packaged transformer substation, ATS, relay protection and synchronization by phase, voltage and frequency.
packaged transformer substation UHL1 and engineering container systems for work on industrial sites.
LFP, 10-90% SOC range, monitoring every storage tier.
At least 3000 cycles with a residual capacity of at least 60% of the initial one.
Contents of the project supply
packaged transformer substation can be replaced with a transformer as part of the BESS module, if this is confirmed by the design solution.
LFP strings, BMS, parallel string logic control and DC cabinets.
Bidirectional PCS, protection, metering and power addition mode when load threshold is exceeded.
Transformer, one-way service panel, automatic transfer switch, relay protection and automation and auxiliary power supply.
Heating, air conditioning, lighting, auxiliary needs, addressable fire alarm.
Local control system, event archive and exchange via Modbus and IEC protocols with the upper level.
Detailed design, drawings, passports, certificates, spare parts, factory acceptance and training.
Budget update
The previous guideline of 449.73 million rubles was formed from a base of $3.5 million and was saved only as an early budget estimate. Factory prices are currently being requested for increased capacity and different cooling systems.
The final budget will include confirmed FOB/DDP, component classification, 22% VAT, logistics, certification, Russian installation and commissioning. This is not a public offer.Scalable versions of HELIKOR
These are commercial options based on the same architecture. Their price is calculated separately taking into account the higher share of fixed project costs.
Design package according to technical specifications
Together with commercial proposal we will fix the number of containers, brands of cells and PCS, single-line diagram, packaged transformer substation 6 kV, production schedule and delivery conditions.