+7 953 733-48-24

Container BESS

Project BESS HELIKOR 5000 kW / ≥10 MWh useful AC energy

Article: SNEE-5000-2H-LFP

Industrial grade containerized electrical energy storage system with a capacity of 5 MW for guaranteed output of at least 10 MWh on the side of 6 kV.

Price on request - calculated according to technical specifications

Project configuration. The final parameters, equipment composition, number of containers, cost and timing are determined after surveying the site and obtaining initial data.

Call Us

The current category declaration is not tied to this model: its scope will be checked after the selection of the manufacturer and the final composition of the equipment.

Technical Data

Model Specifications

The design values ​​are formed according to the technical specifications. The final configuration, guarantees and operating ranges are confirmed by the manufacturer in the technical and commercial proposal.

Status
Project configuration; the final composition is specified according to the technical specifications
Rated output power
5 MW
Useful energy on AC side
at least 10 MWh
Duration of issue
at least 2 hours at full power
Connection voltage
6 kV
Battery technology
lithium ion; LFP preferred
Operating mode
bidirectional charge and discharge
PCS
total design power of at least 5 MVA
Power connection
transformer 0.4/6 kV or high-voltage PCS 6 kV
Control
EMS/SCADA, local and remote control
Automation
automatic charge and switch to power delivery mode
Execution
container, maximum factory readiness
Engineering systems
climate, ventilation and fire-fighting equipment
Reservation
Battery cabinets and converter modules – available in appropriate versions
Northern version
down to −60 °C as a design option after engineering verification
Design life
at least 10 years; confirmed by the manufacturer
Delivery options
installation supervision, commissioning, spare parts and operational documentation

Work scenarios

Where is it used?

The architecture and composition of the system are selected according to the load profile, the mode of the existing generation and the requirements for reserve.

  • 01Oil and gas fields
  • 02Critical infrastructure facilities
  • 03Industrial enterprises
  • 04Remote and isolated energy areas
  • 05Own gas, diesel and renewable generation
  • 06Limiting consumption peaks
  • 07Reservation of responsible consumers
  • 08Improving the quality and sustainability of power supply

Turnkey

From container BESS to commissioning

We will select the energy intensity and PCS for the load profile, coordinate the connection to the network 6 kV, supply containers, packaged transformer substation and perform Russian installation with commissioning.

  1. 01We fix the load profile and connection point
  2. 02Confirm architecture, price and schedule
  3. 03We supply, install and commission the system

Project configuration 5 MW / ≥10 MWh

Get a calculation for the load profile and site

We will record the duration of the reserve, connection point 6 kV, climatic version, composition of containers, PCS, EMS/SCADA and boundaries of installation work.

?HelpAll Products

HELIKOR

Request a quote

Leave your contacts and we will clarify the task, equipment and delivery time.